Novitherm

Novitherm Heat Reflectors have been recognized as a best practice in Living Green Environmental Management Standards Manual.

  • Home
    • What are Novitherm Heat Reflectors?
    • 10 Energy saving tips
  • Utilities Suppliers
    • Current Programs
    • Current DSM Programs
  • For Property Management
    • What are Novitherm Heat Reflectors?
    • Features and Benefits
    • Reduce Heating Costs
    • Go Green Savings
    • Multi-Residential Price List
    • Technical Information
    • Case Studies
    • Current Utility Programs
  • Institutions
    • Hospitals
    • Places of Worship
    • Schools
  • For Homeowners
    • Features and Benefits
    • Reduce Heating Costs
    • Go Green Savings
    • Residential Price List
    • Installation Guide
    • Frequently Asked Questions
    • Technical Information
    • 10 Energy saving tips
  • Quote
  • Contact Page
You are here: Home / Case Studies

Case Studies

Independent Case Study 1 – Performed by Natural Gas Technologies Centre
Addenda Independent Case Study 1 – Performed by Natural Gas Technologies Centre
Independent Case Study 2 – Performed by Natural Gas Technologies Centre
Independent Case Study – Oz Corporation

Our Customer’s Results:

55ParkStreetNJ Management Services

Full Case Study

Results
– decreased heating costs over previous year by approximately 12.6%
Payback Period 1.8 years

Details
– 14 storey apartment building, 94 suites, heated by atmospheric hot water.

345-Merton-Street

Numert Investments

Full Case Study

Results

– 16,886m3 reduction in gas consumption
– decreased heating costs over previous year by approximately 11.3%
Payback Period 1.2 years

Details

– 10 storey apartment building
– 109 suites
– heated by two atmospheric hot water boilers.

90-Cordova-Avenue

Biddington Properties Inc.

Results

– reduced heating costs by 14.5%
Payback Period 1 year

Details

– 14 storey apartment building
– 184 suites
– heated by atmospheric hot water boilers.

Village-ApartmentsMetro Toronto Housing Corp.

Full Case Study

Results

– Primary and secondary heating loops reduced by 15° F
– comfort levels improved -28% reduction in heating costs (1998/99 vs. 2000/01)
– over 121,000m3 saved ($14,560 at 1999 prices/$38,828 in 2001)
Payback Period 1.3 years at $0.12/m3 for natural gas

Details

– 15 storey apartment building
– 379 suites
– built in 1971
– primary/secondary heating loop with DHW fed from primary heating loop

greenwin

Greenwin Property MGMT

Results

– Energy savings/comparison with Novitherm Heat Reflectors 26.0%;
without Heat Reflectors – 1.4%
Payback Period Less than 1 year

Details

– 2 multi-level residential buildings
– free standing case iron radiators
– original windows
– heat reflectors installed in one building only

Bergamont-AvenueBelmont Properties

Full Case Study

Results

– between 7% to 19.8% heat savings (different results per apartment)
Payback Period Under 2 years

Details

– five, 2 storey, 12 unit, brick apartment buildings
– built in 1958
– original hot water boilers with free-standing cast iron radiators

166-Lakeshore-Road

Heritage Building

Full Case Study

Results

– 1,282 m3 reduction in gas consumption
– decreased heating costs over previous year by approximately $16.74
– boiler temperature reduced by 20°F
Payback Period 2.38 years

Details

– 12 storey, brick building
– heated by atmospheric hot water boiler
– free standing cast iron radiators

Copyright © 2025 · Genesis Sample Theme on Genesis Framework · WordPress · Log in